DMJ Engineering Ltd installed over 100T of fabricated high grade steel pipe bridges and pipe track within a very tight programme plan. Under very stringent Quality and Health & Safety criteria.

The steelwork package was installed using specialist machinery sourced via ourselves specific to the project installation. DMJ Engineering Ltd was highly commended on our efficiency, quality and our attitude to H&S. The project value for us was well in advance of £350,000.