Case Studies


We've put together a selection of some of our larger and more recent projects.

Liverpool Gladstone Dock

Liverpool Gladstone Dock

View Case Study →

Shore Access Ladder

Shore Access Ladder

View Case Study →

Morpeth Dam

Morpeth Dam

View Case Study →

Morpeth Sewage Treatment Plant

Morpeth Sewage Treatment Plant

View Case Study →

Ponteland Park Bridge

Ponteland Park Bridge

View Case Study →

Aberdeen Cope Plate

Aberdeen Cope Plate

View Case Study →

Broomley Barn Doors

Broomley Barn Doors

View Case Study →

Churchill Bridge

Churchill Bridge

View Case Study →

BP Salt End Hull

BP Salt End Hull

View Case Study →

Christian Radich Tall Ship

Christian Radich

View Case Study →

Wark Bridge Repairs

Wark Bridge Repairs

View Case Study →

Core Drilling

Core Drilling

View Case Study →

Stainless Steel

Stainless Steel

View Case Study →

Cragside Bridge Refurbishment

Cragside Bridge Refurbishment

View Case Study →

Campbeltown Ferry Terminal

Campbeltown Ferry Terminal

View Case Study →

Aberdeen Harbour Authority

Aberdeen Harbour Authority

View Case Study →

Humshaugh Skate Ramp

Humshaugh Skate Ramp

View Case Study →

Red Slide Footbridge

Red Slide Footbridge

View Case Study →

Gunners Pool Bridge

Gunners Pool Bridge

View Case Study →

Cragside Renovation Works

Cragside Renovation Works

View Case Study →

SITA Waste Transfer Site

DMJ Engineering Ltd Cut and bent over 60Tonnes of 15 and 20mm plate and installed it as wall protection for the SITA Waste Transfer Site in West Sleek burn. The entire operation was completed in less than two weeks, to the surprise of the client and main contractor, all carried out in a safe and controlled manner, to the highest degree of Safety and Quality.

Not yet have we as a company been asked to return to a site to carry out remedial work once we have completed an installation.