Liverpool Gladstone Dock

Liverpool Gladstone Dock

DMJ Engineering was contracted to fabricate and supply two number piling gates for Liverpool Gladstone Dock refurbishment.

The piling gates were fabricated at DMJ Engineering Ltd’s workshops in Northumberland and transported by road to Liverpool.

DMJ Engineering Ltd was involved with all the elements that went together to attach the piling gates to the push up barge. This also involved the fixings to the deck with fabricated steel beams and deck saddles.