Ponteland Park Bridge

Ponteland Park

The existing bridge structure had been condemned, so DMJ Engineering Ltd designed and fabricated a new bridge which was constructed off-site. A new concrete abutment was constructed at each side of the river. The new bridge was transported to site, with the old bridge removed and the new one lifted in to position in one day.