Nature England, Red Slide Footbridge, Castle Eden Dene

Nature England, Red Slide Footbridge, Castle Eden Dene

Working for Nature England, DMJ Engineering designed, fabricated and installed a 20m footbridge under strict Environmental criteria in the Castle Eden Dene. The bridge spans a water course in an area of Special Scientific Interest.

The bridge was fabricated and inspected before being galvanized. Once this process had been carried out the bridge was painted and assembled before being transported from our workshops in Northumberland. The structure was then lifted into place onto the already prepared bearing pads.